The building was built in the early 20th century.
These facilities belong to the category of "newly identified monument of architecture."
In 2014 performed the following works:
1) in order to use the masandra room for hostel was made dismantling of the rooftop, assembling of metal frame, the system of vapor sealing, of damp proofing, heat insulation of the rooftop, assembling of the metal shingles and system of drain, the assembling of windows
2)in order to receive the approval documents for using of basement level in accordance with the project solution were made the works on engineering of earth on the project point, of machine of concrete reinforced buckle
3)100% assembling of windows for the face of building; all glass units are energy saving, noise attenuating, the first floor and basement level are security windows with temperature glass units; for the central avant corps of the front entrance the windows were made from the ash tree (double glass units).
4) the reconstruction of the facade buildings, the reconstruction of the balconies in accordance with designed technology performing of the facade works by Ukrainian scientific-research institute
Page views divided according to country of origin
Change date interval
For a better use of Realigro website, set your preferences for language, currency, square meters or sq ft.
Set now Don't show again