Sale of a cannery in the agricultural region of Ukraine
Location:
Ukraine, Gorodok, Khmelnytsky region. (50 km to the city of Khmelnytsky, 380 km to the city of Kiev)
The area of the land: 12.0 ha (lease). Possibilities of expansion up to 45 hectares.
The total area of buildings and structures: 15 023.7 m2.
Productivity: 12 million conditional cans per year
Utilities:
Electricity: 1020 kW, 5 substations.
Gas: Boiler area with steam boilers DKVR (ДКВР) 6,5x13
Water: 4-m wells, total debit of 25 m3 / hour and 150-m well for potable water. Water tower capacity 200 m3
The plant owns treatment facilities with a capacity of 1500 cubic meters a day, which occupy a territory of 2.62 hectares.
The railway track length is 350m (200m on the territory of the plant and 150m outside the factory, subject to recovery), goes directly to the railway station.
Current state: closed for safekeeping
LLC "Gorodotsky Cannery" is an enterprise with great potential. The plant was built according to the standard project K-7, equipped with Hungarian equipment and put into operation in 1972. In 1974, a juice and wine shop was built in which the Bulgarian line for the production of concentrated clarified apple juice with a capacity of 4 tons / hour was installed, in 1979 a meat and vegetable shop was put into operation, then an alcohol-free workshop and other capacities, which made it possible to go out with the project capacity 7 million conditional cans per year on 24 million conditional cans in 1993 with an assortment of 112 items. For today, the average weighted capacity is 12 million conditional cans per year.
In 2003-2004 the plant was reconstructed. In 2012 the complex was properly preserved and carefully guarded to the present. To start the plant requires repair and reconstruction of some systems.